Configuration Control Board Configuration Management Systems Engineering

This authority can be
the Current Document Change Authority (CDCA), described in b. Below,
for individual documents that require change (e.g., a system or
CI performance specification). If it is not the CDCA for a given
document, it does not have the authority to approve a proposed change
to that document, and therefore must solicit ECP approval from the
applicable CDCA, or select an alternate design. Configuration control is perhaps the most visible element of
configuration management. The contractor makes the decision when the change is to items/configuration
documentation for which it is the configuration control authority,
provided those changes do not impact the Government’s baselines.

configuration control boards

The functional architecture should be placed under technical configuration control to establish a functional design baseline for software design synthesis. The functional architecture must be complete and traceable to software specifications. A structured configuration control boards and consistent process for CCB meetings and reviews can help streamline the workflow and reduce the risk of errors and inconsistencies. By following such a process, changes can be managed in a timely, transparent, and traceable manner.

Business Analysts and Requirements Engineers

Before we deploy any updates to the site, code goes  through three human evaluations and at least three rounds of automated testing. DevOps is aimed at reducing the risks of system downtime and failures when you deploy new software and updates. Overall, a well-managed DevOps process will mean you have less downtime and higher availability of your systems because smaller deploys are less likely to cause problems. This also allows for seamless deployments and helps your team maintain less-disruptive schedules. Conversely, a lack of structure can lead to inconsistencies that make working across the organization difficult, because interoperability can be undervalued the further you are from central decision making. You can also get very inconsistent results, with some projects falling behind standards.

configuration control boards

The results in terms of pollutant removal and energy consumption are reported in Table 2, where they are compared with the results obtained with the control default configuration of BSM1. The organization tests, validates, and documents changes to the information system before implementing the changes on the operational system. In some projects the CCB may also be responsible for verifying that approved changes are implemented.

How a Change Advisory Board makes decisions

The organization’s change management policy will define the CAB’s constitution and its scope, which can include anything from proposals and deployments to changes to roles and documentation. Organizations may choose to have a single CCB handling change requests across multiple projects. A low-level CCB could handle lower priority change requests, for instance non-customer-facing features or changes with low/no cost impact. A higher-level CCB could tackle major change requests that have significant impact on costs or customer. The Change Control Board and the Change Advisory Board are similar organizational structures play vital roles in decision making.

configuration control boards

Automated tests are run on any code corrections via a PR and PR review to the release branch. As a public user, I want to know that my complaint was submitted so that I can complete the process and save the information for my records. Roadmaps need to be regularly updated and renegotiated as the project develops to make sure you are building the right product.

RE Definition: Configuration Control Board

To approve
the CCB Directive (CCBD), a person must be the primary (or alternate)
CCB member designated by the CCB charter. The CDCA on the other hand, pertains to specifications or any
other type of document and is independent of the organization that
physically maintains and stores the document. The CDCA is the organization
that has the decision authority over the contents of the document,
reflecting proprietary or data rights to the information that the
document contains. The CDCA may be a Government activity or a contractor,
and the authority may be transferred. Now I hope you will not have any problem solving questions on the PMP exam regarding change management and configuration management systems. Please note that in the first case, you raised the change request to increase the deadline of the project by one week.

In response to a CCB Directive,
the Government contracting office prepares and negotiates a contract
modification to authorize the contractor to proceed with implementation
of the approved class I ECP or major/critical deviation. Another key to successful CCB meetings and reviews is to prepare the change requests and supporting documents in advance. A change request is a formal document that describes the proposed change, its rationale, its impact, its priority, and its dependencies. Supporting documents may include technical specifications, design drawings, test results, risk assessments, cost estimates, and customer feedback. Preparing these documents ahead of time ensures that the CCB has all the information it needs to evaluate the change request and make an informed decision. Configuration management (CM) is a process of identifying, tracking, and controlling changes to the configuration items (CIs) that make up a system or product.

N-Tier Architecture: Tier 2, Tier 3, and Multi-Tier Explained

His specialties are IT Service Management, Business Process Reengineering, Cyber Resilience and Project Management. Learn how ServiceOps can help you predict change risks using service and operational data, support cross-functional collaboration to solve problems, and automatically recommend problem resolutions. The CAB can also meet to review previously executed changes particularly those that were unsuccessful or unauthorized, as well as plan the forward schedule of future changes particularly with regard to projected service outage and customer/business plans. When taken together, these security control principles form the basis for the security requirements, which should be defined in any level of architecture and design.

  • Change management and configuration management do not compete for the same space.
  • Without these components, companies will fall behind competitors who make changes quickly and safely.
  • Additionally, decision-making techniques can help analyze, compare, and choose among different options for change requests.
  • The CCB then
    reviews the proposal and the implementation commitments and either
    approves or disapproves them in accordance with the procuring activity’s
    policy.

CM provides an orderly way to facilitate change, based on a documented requirements baseline, and utilizing best practices in the change management process. This is intended to ensure that expectations are fully understood and realized in an efficient manner, including proper consideration of all potential impacts on customers and resources. CM is a necessary and critical process to assure an orderly and stable evolution of any Architectural Description and also to ensure that the DoDAF remains current in the face of evolving methods and techniques of Architectural Description creation and management.

Using agile and DevOps and agile parties agree on measurable outcomes

To manage these conflicts and expectations adequately, it is important to establish clear ground rules and guidelines for the CCB meetings and reviews, such as roles, responsibilities, procedures, criteria, and deadlines. Additionally, encouraging respectful and constructive dialogue between the CCB members and other stakeholders is essential; personal attacks, blame, or criticism should be avoided. Acknowledging and addressing any concerns or issues raised by the CCB members and other stakeholders should also be done while providing evidence, rationale, and alternatives where possible.

configuration control boards

Traditional change control boards use these large documents as their main artifacts for review. Though it may feel safe at the time, requirements gathering is a very risky and flawed practice. It is impossible to anticipate the needs of all your users and stakeholders, and business needs and policies will undoubtedly change.

Business vs IT vs Digital Transformation: Strategy Across 3 Critical Domains

Each milestone in your roadmap is high-level and can be implemented in many different ways. The first step in breaking down those higher-order outcomes is to create user stories that describe the outcome someone using your product or process is looking for and why they want that outcome. Keeping track of the state of the board and other system variables can be just as important as knowing what version of the FPGA was loaded at the time of a specific fault or failure.

Article was published on: 10/18/23

Author: Viktor Nikolaev

Victor is a professional crypto investor and stockbroker, specializing in such areas as trading on the stock exchange, cryptov currencies, forex, stocks and bonds. In this blog he shares the secrets of trading, current currency indices, crypt currency rates and tells about the best forex brokers. If you have any questions, you can always contact nikolaev@forexaggregator.com

Leave a Reply